SecureTrack GPS Tracker For Seniors With Waterproof Design And Real Time Updates

SecureTrack GPS Tracker For Seniors With Waterproof Design And Real Time Updates

Angebotspreis  €50,95 Normaler Preis €61,95
Zu Produktinformationen springen
SecureTrack GPS Tracker For Seniors With Waterproof Design And Real Time Updates

SecureTrack GPS Tracker For Seniors With Waterproof Design And Real Time Updates

Angebotspreis  €50,95 Normaler Preis €61,95
Inkl. Steuern. Versandkosten werden beim Checkout berechnet.

SecureTrack GPS Tracker for Seniors with Waterproof Design and Real Time Updates

GPS Tracker for Seniors with Real-Time Location Updates. SecureTrack is a discreet and lightweight GPS tracker designed specifically for seniors, ensuring their safety and independence. Weighing only 10g, this device easily attaches to clothing, bags, or keys and works seamlessly with the Find My app on iOS, providing precise real-time location updates without ongoing fees.

Key features

Real-time tracking, stay-up-to-date location updates via the Find My network. No ongoing fees: a one-time purchase with no monthly subscription costs.

  • Global coverage: ideal for everyday travel or visits abroad, ensuring safety wherever you go.
  • Lightweight design: at just 10g, it blends into daily life without drawing attention.
  • Extended battery life: operates for up to 12 months on a single CR2032 coin cell battery.
  • Waterproof and durable: IP67 rating withstands daily activities and splashes.
  • Safe zones and alerts: receive notifications if a senior leaves designated safe areas.
  • Easy for seniors: the tracker is passive, with caregivers managing updates via the Find My app.

Specifications

  • Compatibility: iOS and Find My app
  • Battery: CR2032 coin cell (200mAh), up to 12 months per battery
  • Weight: 10g
  • Waterproof rating: IP67
  • Functions: Real-time GPS tracking, safe zone alerts, anti-loss tracking
  • Material: Protective case with keychain or strap

Made with care

Great value

Elegant design

Quality materials

Versand

Bearbeitungszeit

  • Bestellungen werden innerhalb von 1 Werktag bearbeitet

Versandkosten

  • Kostenloser Versand für alle Bestellungen

Voraussichtliche Lieferzeiten

  • Deutschland: 2–8 Werktage

Shop The Full Collection

2024 Portable Air Conditioner with 3-Speed Cooling Fan for Bedroom and Office – Quiet & Compact | ormexis

20mm Milanese Rose Gold Watch Strap With Quick Release

22mm Nylon Quick-Release Strap For Watches Black Mix Replacement

3-in-1 Air Cooler with HEPA Purifier | ormexis

3-in-1 Air Cooler with HEPA Purifier | ormexis

Angebotspreis  €218,95 Normaler Preis €437,95